Technical guide · NPPF

How the grey belt rules changed

The December 2024 Framework created grey belt. The August 2026 Framework kept the core test but changed what counts, how it is assessed and how schemes can come forward. Here is the detail.

Timeline

30 Jul 2024

Consultation on NPPF reforms

The new government proposes "grey belt", defined loosely as previously developed land and other land making a limited contribution to Green Belt purposes.

12 Dec 2024

December 2024 NPPF

Grey belt defined in Annex 2 against purposes (a), (b) and (d) of paragraph 143, excluding land where footnote 7 policies give a strong reason to refuse. Decision route at paragraph 155; Golden Rules at paragraphs 156–157.

Feb 2025

Green Belt Planning Practice Guidance

Sets the strong / moderate / weak-or-none approach and confirms that villages are not "large built-up areas" or "towns".

2025

First wave of appeals

Inspectors allow schemes at Bagshot, Walton-on-Thames, Burcot and elsewhere; others fail where footnote 7 heritage harm excludes the land (Boscobel Lane, Toot Hill).

16 Dec 2025

Draft NPPF published for consultation

Proposes coded policies, removing footnote 7 from the grey belt definition, and moving the assessment method into a new Annex E.

30 Jan 2026

Wrotham Parish Council v SSHCLG [2026] EWHC 165 (Admin)

The High Court (Lieven J) upholds an inspector who tested footnote 7 against the development proposed, not against hypothetical development of the land.

17 Aug 2026

August 2026 NPPF

Chapter 13 becomes policies GB1–GB8, with the grey belt definition in Annex B and the assessment method in Annex E. Material to decisions from publication.

Sep–Oct 2026

First appeals under GB7

At least 13 grey belt decisions under the new policies within seven weeks. See the list.

The definition, then and now

December 2024 (Annex 2)

Grey belt was land in the Green Belt comprising previously developed land and/or any other land that, in either case, does not strongly contribute to any of purposes (a), (b) or (d) in paragraph 143. It excluded land where the policies relating to the areas or assets in footnote 7 (other than Green Belt) would provide a strong reason for refusing or restricting development.

August 2026 (Annex B)

Grey belt is land in the Green Belt comprising previously developed land and/or any other land that does not strongly contribute to any of purposes (a), (b) or (d) in policy GB2. The footnote 7 exclusion has gone.

Note "in either case": previously developed land is not automatically grey belt. It must also not strongly contribute to purposes A, B or D, although in practice developed land usually contributes less.

The big change: footnote 7

Under the 2024 wording, deciding whether land was grey belt meant first asking whether a protected asset nearby, such as a listed building, an archaeological priority area or a flood zone, gave a "strong reason" to refuse. That mixed up two questions, and led to arguments about whether the test applied to the land in general or to the particular scheme. In Wrotham the High Court held it applied to the development proposed.

The 2026 Framework separates the two questions. Classification (is it grey belt?) depends only on purposes A, B and D. Acceptability (should it be built on?) still applies heritage, landscape, flood risk and other policies in the usual way.

Real effect: Sutton's assessment

Sutton's June 2026 Green Belt review found 8 parcels that did not strongly contribute to purposes A, B or D. Under the 2024 definition, only 4 were grey belt and 4 were "potential" grey belt because of an archaeological priority area or listed buildings. Under the new definition, all 8 would be grey belt. More council assessments →

Side by side

December 2024 vs August 2026.

Rows marked changed are where the August 2026 Framework alters the position.

TopicDecember 2024 NPPFAugust 2026 NPPF
Where the policy sitsChapter 13, paragraphs 142–160; definition in Annex 2 glossaryChapter 13, policies GB1–GB8; definition in Annex B; method in Annex Echanged
Core testDoes not strongly contribute to purposes (a), (b) or (d) of para 143Same test, against purposes (a), (b) or (d) of GB2
Footnote 7 assetsLand excluded if footnote 7 policies give a strong reason to refuse or restrict (judged against the proposal: Wrotham)No longer part of the definition. Heritage, flood, landscape and similar policies apply separatelychanged
How land is assessedPlanning Practice Guidance (Feb 2025): strong / moderate / weak or noneAnnex E of the NPPF: stage 1a assessment areas, 1b grey belt against A, B, D, 1c "fundamentally undermine" test. Plans must be informed by it (GB2(3))changed
Decision routePara 155: (a) not fundamentally undermine purposes of remaining Green Belt; (b) demonstrable unmet need; (c) sustainable location (paras 110, 115); (d) Golden RulesGB7(1)(g): same four tests; sustainable location "with particular reference to policy TR3"changed
Unmet need (housing)No five-year housing land supply, or Housing Delivery Test below 75%Same (footnote 41). For traveller sites, no five-year supply of pitches
Station-led developmentNo separate routeGB7(1)(h): homes or mixed use within reasonable walking distance (about 800 m) of a well-connected station, with no grey belt or unmet-need testnew
Golden RulesParas 156–157: affordable housing 15 points above the highest local requirement (capped at 50%); infrastructure; accessible green spaceGB8: same core rules, plus viability evidence only in three cases (previously developed land with abnormal costs, strategic sites, a wholly different type of development)changed
Release order in plansPara 148: previously developed land, then grey belt, then other Green BeltGB4(1)(d)(i): same order. Neighbourhood plans can alter boundaries in limited cases
Infrastructure exceptionLocal transport infrastructureTransport, electricity, water and telecoms infrastructure (GB7(1)(f))changed
Applies toDecisions until 16 Aug 2026; legacy plans under transitional rulesAll decisions from 17 Aug 2026, including applications made earlier and appeals in progress

Summary in our words. Always check the policy text on GOV.UK before relying on it.

GB7(1)(g): the four grey belt tests

Development on grey belt is "not inappropriate" only if all four tests are met. Fail one and the scheme is inappropriate development, needing very special circumstances.

i

Uses grey belt and does not fundamentally undermine the Green Belt

Development must not fundamentally undermine the purposes, taken together, of the remaining Green Belt across the plan area. Small and medium sites rarely fail this test.

ii

Evidenced unmet need

For housing: no five-year supply (including any buffer) or a Housing Delivery Test result below 75%. A replacement house adds no home, so it cannot show need (Neston, Oct 2026).

iii

Sustainable location (TR3)

The most common reason grey belt schemes fail. Unlit lanes without footways and infrequent buses have sunk schemes at Copthorne Bank and even beside Hatton station.

iv

Golden Rules for major housing

Ten or more homes, or 0.5 ha or more: affordable housing, infrastructure and green space under GB8.

GB7(1)(h): the new station route

Residential or mixed-use development is also "not inappropriate" if it is within reasonable walking distance of a well-connected station (normally about 800 metres), is physically well related to the station or its settlement, is of a scale infrastructure can handle, does not prejudice long-term comprehensive development, and (for major development) meets the Golden Rules.

A well-connected station is a railway station, or underground, tram or light rail stop, in one of England's top 80 Travel to Work Areas, with at least four services an hour (or two an hour in one direction) through a normal weekday daytime, or a reasonable prospect of that.

The land does not have to be grey belt, and no unmet need has to be shown. In plan-making, councils do not need to show exceptional circumstances to release land around such stations (GB3(4)).

GB8: the Golden Rules

Affordable housingSet by up-to-date plan policy for Green Belt release. Until then, 15 percentage points above the highest affordable housing requirement that would otherwise apply, capped at 50% (or 50% where there is no requirement).
InfrastructureNecessary improvements to local or national infrastructure.
Green spaceNew or improved publicly accessible green space within a short walk of the homes, contributing to landscape setting and nature recovery.
ViabilityOnly for previously developed land with costs not allowed for in plan viability, strategic sites, or a wholly different type of development. Still the maximum possible contribution.

Compliance with the Golden Rules carries substantial weight in favour. The rules do not apply to traveller sites, or to land released by plans adopted, or permissions granted, before 12 December 2024.

Plan-making

Every Local Plan must now be informed by a Green Belt assessment, prepared using Annex E, that identifies grey belt (GB2(3)). Boundaries can only change through plans, in fully evidenced exceptional circumstances (GB3), which include being unable to meet development needs after using brownfield land and optimising density. When land is released, previously developed land comes first, then other grey belt, then other Green Belt (GB4).

Which rules apply to my site?

Planning applications and appeals: the August 2026 policies have been a material consideration since 17 August 2026, including for applications submitted earlier and appeals already under way. Inspectors have either invited comments or decided that the changes made no material difference to the parties' cases.

Local Plans: plans prepared under the new plan-making system use the 2026 Framework. Some plans already well advanced continue under the December 2024 Framework under its transitional provisions. Neighbourhood plans submitted on or before publication continue under the December 2024 Framework.